90 Degree L/R and S/R Return Tubes, ASTM A403 WP316L Stainless Steel Elbow: Depending on the bend radius finned tubing can be formed directly over a mandrel thereby eliminating the need for bending bares. "U" bends can still be supplied with center bare areas if necessary. Our FINBRAZE® products can be easily coiled using a tube made of Copper, Carbon,Steel, Stainless Steel and other common metal types.
90 Degree L/R and S/R Return Tubes, ASTM A403 WP316L Stainless Steel Elbow
1.Product Details:
Place of Origin: |
China. Imported materials are available. |
Brand Name: |
Baerfu |
Certification: |
ISO... |
Model Number: |
Tube Coil |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Packaging Details: |
Solid fumigated wooden box |
Delivery Time: |
Ex-Work within 1 month on receipt of order. |
Payment Terms: |
T/T, L/C |
3.Detailed Product Description
Company Type: |
Manufactuer,Importer & Exporter |
Secondary Operations: |
Elbows,"U" Bends & Tube Coils |
Origin: |
China |
Nearest Port: |
Shanghai Port,China |
Professional Associations: |
Cryogenic Society Of America |
|
|
High Light: |
90 degree elbow,180 degree pipe elbow |
90 Degree L/R & S/R Return Tubes , ASTM A403 WP316L Stainless Steel Elbow
4.Specifications
ASTM A403 WP316L elbow
1.ASTM A403 WP316L elbow tee reducer cap
2.ASTM A403 WP316L/316/316H/316Ti elbow
3.22.5/45/90/180
ASTM A403 WP316L elbow
Elbow Type |
Butt welding/BW elbow, Socket welding/SW elbow, Threaded elbow, seamless elbow, welded elbow |
Standard |
ASME/ANSI B16.9,ANSI/ASME B16.11, ANSI/ASME B16.28; MSS SP-43,MSS SP-75,MSS SP-79, JIS B2311,JIS B2312,JIS B2313,JIS B2316 SY/T 0510,SH3408,SH3409, ISO 3419,ISO 5251, DIN 2605 |
Size |
1/2’’~48’’(Seamless);16’’~72’’(Welded) |
Wall thickness |
Sch5~Sch160XXS |
Manufacturing process |
Push, Press, Forge, Cast, etc. |
Material |
Carbon steel reducer, stainless steel reducer, alloy steel reducer |
Carbon steel |
ASTM A234 WPB, WPC ASTM A420 WPL6, WPL3; ASTM A860 WPHY42/WPHY52/WPHY60/WPHY65 |
Stainless steel |
ASTM A403 304/304L/316/316L/317L/321/347 |
Alloy steel |
ASTM A234 WP5/WP9/WP11/WP12/WP22/WP91 |
Duplex steel |
ASTM A815 S31803/S32750/S32760 |
Nickel alloy steel |
Alloy 200/nickel 200/UNS S2200 Alloy 400/Monel 400/UNS 4400 Alloy 600/Inconel 600/UNS,6600 Alloy 201/nickel 201/UNS S2201 Alloy 625/Inconel 625/UNS 6625/NS336 Alloy 800/Incoloy 800/UNS NO8810 |
Package |
Wooden cases, pallets, nylon bags or according to the customers' requiremen |
Depending on the bend radius finned tubing can be formed directly over a mandrel thereby eliminating the need for bending bares. "U" bends can still be supplied with center bare areas if necessary. Our FINBRAZE® products can be easily coiled using a tube made of Copper, Carbon,Steel, Stainless Steel and other common metal types.
5.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |