ASTM A210 Boiler carbon steel seamless tube Wall Thickness 0.8mm - 15mm: Chemical Composition Inspection, Mechanical Properties Test(Tensile Strength, Yield Strength,Elongation, Flaring, Flattening, Bending, Hardness, Impact Test),Surface and Dimension Test,Nodestructive Test, Hydrostatic Test.
ASTM A210 Boiler carbon steel seamless tube Wall Thickness 0.8mm - 15mm
1.Product Details:
Place of Origin: |
China |
Brand Name: |
Baerfu |
Certification: |
ISO... |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Packaging Details: |
wooden box |
Delivery Time: |
Ex-work within 1 month after order. |
Payment Terms: |
T/T, L/C |
3.Detailed Product Description
High Light: |
carbon steel seamless tube,carbon seamless steel pipe |
ASTM A210 Seamless Carbon Steel Tube , Boiler Steel Pipe Wall Thickness 0.8mm - 15mm
4.Quick Detail:
Standard: ASTM A210/A210M (ASME SA210/SA210M)
Seamless Medium-Carbon Steel Boiler and Superheater Tubes
Size:(mm)
Out Dimensions: 12.7mm-114.3mm
Wall Thickness: 0.8mm-15mm
Length: 5-25mm
5.Applications:
It is used for boiler and boiler flue tubes. Including safe end, vault and supporting tube and super heater min wall thickness seamless medium--carbon steel tube
6.Chemical Requirements:
STANDARD |
GRADE |
CHEMICAL COMPOSITION |
|||||||||
C |
Si |
Mn |
P |
S |
Cr |
Mo |
Cu |
Ni |
V |
||
ASTM A210 |
A-1 |
≤0.27 |
≥0.10 |
≤0.93 |
≤0.035 |
≤0.035 |
|
|
|
|
|
C |
≤0.35 |
≥0.10 |
0.291.06 |
≤0.035 |
≤0.035 |
|
|
|
|
|
7.Mechanical Properties:
Grade |
Yield Strength (Mpa) |
Tensile Strength (Mpa) |
Elongation (%) |
A-1 |
≥255 |
≥415 |
30 |
C |
≥275 |
≥485 |
30 |
8.Wall Thickness Tolerance
|
OD |
WT |
WT Tolerance |
<=38.1 |
/ |
+20%,-0% |
|
>38.1 |
/ |
+20%,-0% |
9.Description:
ASTM A210 is the standard covers seamless medium-carbon steel boiler and superheater tubes.ASTM A210 also covers minimum-wall-thickness, tubing sizes, boiler flues including safe ends, arch and stay tubes. ASTM A210 provides tensile and hardness properties but only applicable to certain size limitations. Material manufacturing shall be killed. Tubes shall be made by seamless process, marked as either hot-finished or cold-finished. Surface condition shall be specifically stated in the order. Chemical composition shall conform to the requirements. Elemental composition other than listed here shall not be permitted. Tension test, flattening test, flaring test, hardness test, hydrostatic or nondestructive electric test shall be made on specimens. Superheater tubes shall be formed without defects and shall withstand expansion, beading, forging, welding, and bending.
10.Steel Grde:
Grade A1; Grade C
11.Packing:
Beveled/black painting/ plastic caps/ in bundles/ steel strips/ wooden protection
12.Inspection and Test:
Chemical Composition Inspection, Mechanical Properties Test(Tensile Strength, Yield Strength,Elongation, Flaring, Flattening, Bending, Hardness, Impact Test),Surface and Dimension Test,Nodestructive Test, Hydrostatic Test.
13.Surface treatment:
Oil-dip, Varnish, Passivation, Phosphating, Shot Blasting
14.Mark:
As requested.
15.Delivery Condition:
Annealed, Normalized, Normalized and Tempered
16.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |