Embedded Fluted Carbon Steel Seamless Single Row Flat Fin Tube 0.5mm thickness: The common application fields are: Heat exchangers units for power plant(electric, nuclear, thermal and geothermal power plants); High corrosive systems (condensers, evaporators, sea water desalinations, fertilizing, urea systems, ammonia, gas, corrosive acids); The petroleum, chemical and petrochemical industries; The food processing and refrigeration industries; Natural gas treatment.
Embedded Fluted Carbon Steel Seamless Single Row Flat Fin Tube 0.5mm thickness
1.Product Details:
Place of Origin: |
China. |
Brand Name: |
Baerfu |
Certification: |
ISO... |
Model Number: |
Type G fin tube |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Price: |
N/A |
Packaging Details: |
(1) Steel frame case sealed by plywoods with each end capped;(2) Solid fumigated wooden box with each end capped. |
Delivery Time: |
Ex-work with 1 month after order. |
Payment Terms: |
T/T, L/C |
Supply Ability: |
Daily capacity up to 7,000 Meters |
3.Detailed Product Description
Compamy Type: |
Manufacturer, Importer & Exporter |
Fin Tube Type: |
Grooved Fin Tube,G-Fin Tube |
Tube Material: |
Carbon Steel, Stainless Steel, Alloy Steel, Copper Etc... |
Fin Material: |
Aluminum, Copper And Steel |
Tube Length: |
No Limit |
Tube Wall Thk: |
No Limit |
Fin Height: |
16mm Max |
Fin Pitch: |
Min. 12FPI |
High Light: |
carbon steel finned tubes,finned aluminum tubing |
Seamless Carbon Steel Embedded Fluted Finned Tube With 0.5mm thk copper Stock
4.Detail:
G Fin Finning Lines: 7 finning machines.
Daily capacity up to 7,000 meters.
Tube OD: 50.8mm(2'') max.
Tube Length: 18,000mm max.
Fin Height: 16.5 mm max.
Fin Thickness: generally 0.4mm ~0.6mm
Fin Pitch: 2.1 mm (12FPI) min.
Manufacturing process
The aluminum fin strip is tension wound and placed into a groove cut into the tube.
G Fin Fluted Depth:
Appr. 0.4mm.
Surface Protection:
Zinc or Aluminum metalized applied by an electro spray arc system coating.
Acceptance criteria:
API Standard 661(Air-Cooled Heat Exchangers for General Refinery Service) or the delivery conditions.
Accessories
Tube support box, clamp or spacer box (Materials: Aluminum, Zinc and Stainless Steel).
5.Delivery condition:
Tube ends are square cut, free burrs, internally dried and air blown clean, externally coated with varnish at both ends of G-Fin Embedded Finned Tube.
6.Packing:
The desiccants are put into each package for continental transporation as well.
7.Applications:
■ The common application fields are:
■ Heat exchangers units for power plant(electric, nuclear, thermal and geothermal power plants);
■ High corrosive systems (condensers, evaporators, sea water desalinations, fertilizing, urea systems, ammonia, gas, corrosive acids);
■ The petroleum, chemical and petrochemical industries;
■ The food processing and refrigeration industries;
■ Natural gas treatment;
8.Specifications:
Grooved G type Finned Tubes are combined with two different materials.
Items |
General Materials |
Popular ASTM Materials |
Core Tube Material |
carbon steel, ow-alloy steel, stainless steel, brass, copper, cooper-nickel alloys, aluminum bronze, nickel alloys. |
1. Carbon Steel: A179, A192,SA210 Gr A1/C,A106 Gr B 2. Stainless Steel: TP304/304L,TP316/TP316L/316Ti, A789 S31803/S2205 etc... 3. Copper:UNS12200/UNS14200/UNS70600, CuNi70/30,CuNi 90/10 |
Fins Material |
1. Aluminum 2. Copper. |
1. Aluminum(Alu.1100,Alu.1060) 2. Copper. |
All dimensions are in Inches and specification upon your requests. |
|||
Tube OD |
Fin Height |
Fin Thickness |
Fins per Pitch(Density) |
5/8 |
3/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
3/4 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 1/4 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 1/2 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
Please email us for more information. |
9.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |