Installation process of
fin tube radiator
1. Before installation, we must carry out on-site measurement to determine the model, number of finned tube radiators and the specific installation location.
2. Various accessories for radiator installation, such as boards, pliers, screwdrivers and other common tools.
3. The pre-installation includes the positioning of heating equipment, slotting, piping, pipe connection, installation of water collector, pressure test, etc.
4. The later installation includes the installation of the
fin tube radiator, the pressure test of the entire system and the debugging of the
fin tube radiator, etc.
5. Pay attention to the installation and construction process, before or after the construction of water and electricity, it should be carried out before the construction of other decoration procedures.
6. If the heating is installed before decoration, the branch pipe connecting the heating main pipe and the finned tube radiator should be buried under the floor and in the wall. Do not leak the pipe outside to avoid damage.
7. When the fin tube is selected, the number of fins, the width of each fin, the distance between the fins, the way of water intake, and the distance between the interfaces, should be accurate in size to avoid affecting the installation of the
fin tube radiator in the later stage.
Finned tube radiator is a kind of heat exchange equipment. The water heater uses wall-hung boilers or boilers to heat the circulating water, and then connects to the finned tube radiator through pipes, and then outputs the appropriate temperature through the finned tube radiator to form an indoor temperature difference. , And then heat cycle, so that the indoor temperature can rise evenly.
1. Before installation, we must carry out on-site measurement to determine the model, number of finned tube radiators and the specific installation location.
2. Various accessories for radiator installation, such as boards, pliers, screwdrivers and other common tools.
3. The pre-installation includes the positioning of heating equipment, slotting, piping, pipe connection, installation of water collector, pressure test, etc.
4. The later installation includes the installation of the
fin tube radiator, the pressure test of the entire system and the debugging of the fin tube radiator, etc.
5. Pay attention to the installation and construction process, before or after the construction of water and electricity, it should be carried out before the construction of other decoration procedures.
6. If the heating is installed before decoration, the branch pipe connecting the heating main pipe and the finned tube radiator should be buried under the floor and in the wall. Do not leak the pipe outside to avoid damage.
7. When the fin tube is selected, the number of fins, the width of each fin, the distance between the fins, the way of water intake, and the distance between the interfaces, should be accurate in size to avoid affecting the installation of the
fin tube radiator in the later stage.
Increasing the outer surface area or inner surface area of the light pipe can achieve the purpose of increasing the heat exchange efficiency. This is a wear-resistant, new type of heat exchange material. It is an energy-saving heat exchange element during use. The equipment mainly uses high-frequency power as the heat source to heat the steel pipe and the steel strip at the same time, and weld the two together. Together, become one.
8. The high-frequency welding finned tube has the functions of high heat exchange efficiency and large heat dissipation area. The whole product has the advantages of long service life and wide temperature range. The product is used in petrochemical industry, economizer, waste heat recovery, greenhouse , Power station boilers, wood drying and other industrial fields. The installation of the high-frequency welding finned tube is simple, reducing the connection points, so that the equipment installation becomes economical and quick, and the probability of water leakage at the connection is also reduced. The product maintenance is simple. After the installation is completed, no special maintenance is required.