TP316 SMLS Stainless Steel Heat Exchanger Fin Tube Cylindrical Studs: Tube ends are square cut, free burrs, internally dried and air blown clean, externally coated with varnish at both ends of extruded bimetallic fin tube.
TP316 SMLS Stainless Steel Heat Exchanger Fin Tube Cylindrical Studs
1.Product Details:
Place of Origin: |
China.Imported materials are available |
Brand Name: |
Baerfu |
Certification: |
ISO... |
Model Number: |
Studs |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Price: |
N/A |
Packaging Details: |
(1) Waterproof steel frame bundle with each end capped; (2) Steel frame case sealed by plywoods with each end capped. |
Delivery Time: |
Ex-work with 5 week on receipt of order. |
Payment Terms: |
T/T, L/C |
Supply Ability: |
Daily capacity up to 80,000 Studs |
3.Detailed Product Description
Compamy Type: |
Manufacturer, Importer & Exporter |
Fin Tube Type: |
Studded Tubes/Stud Welding Tube |
Fins Type: |
Round,Oval,Pin |
Origin: |
China |
Nearest Port: |
Shanghai Port, China |
Recent Buyer: |
From Korea In Oct In 2014 |
High Light: |
stainless steel Heat Exchanger Fin Tube, TP316 Heat Exchanger Fin Tube, TP316 finned stainless steel Tube |
■ A213 TP316 / TP316L SMLS stainless steel , NPS 8''(219.08mm) power station boiler studded tube
ASTM A213 / A213M :
Standard Specification for Seamless Ferritic and Austenitic Alloy-Steel Boiler, Superheater, and Heat-Exchanger Tubes
Executive Standard |
ASTM A213/A213M |
Materials Grade |
T2, T5, T5b, T5c, T9, T11, T12, T17, T21, T22, T23, T24, T36, T91, T92, T122, T911 |
Material Grade and Chemical Composition(%):
Grade |
C |
Mn |
P≤ |
S≤ |
Si |
Cr |
Mo |
V≥ |
T11 |
0.05-0.15 |
0.30-0.60 |
0.025 |
0.025 |
0.50-1.00 |
0.50-1.00 |
1.00-1.50 |
|
T12 |
0.05-0.15 |
0.30-0.61 |
0.025 |
0.025 |
≤0.50 |
0.80-1.25 |
0.44-0.65 |
|
T13 |
0.05-0.15 |
0.30-0.60 |
0.025 |
0.025 |
≤0.50 |
1.90-2.60 |
0.87-1.13 |
|
T2 |
0.10-0.20 |
0.30-0.61 |
0.025 |
0.025 |
0.10-0.30 |
0.50-0.81 |
0.44-0.65 |
|
T5 |
≤0.15 |
0.30-0.60 |
0.025 |
0.025 |
≤0.50 |
4.00-6.00 |
0.45-0.65 |
|
T5b |
≤0.15 |
0.30-0.60 |
0.025 |
0.025 |
1.00-2.00 |
4.00-6.00 |
0.45-0.65 |
|
T5c |
≤0.12 |
0.30-0.60 |
0.025 |
0.025 |
≤0.50 |
4.00-6.00 |
0.45-0.65 |
|
T9 |
≤0.15 |
0.30-0.60 |
0.025 |
0.025 |
0.25-1.00 |
8.00-10.00 |
0.9-1.0 |
|
T22 |
0.05-0.15 |
0.30-0.60 |
0.025 |
0.025 |
≤0.50 |
1.90-2.60 |
0.87-1.13 |
|
T91 |
0.08-0.12 |
0.30-0.60 |
0.020 |
0.010 |
≤0.50 |
8-9.50 |
0.85-1.05 |
0.18-0.25 |
T92 |
0.07-0.13 |
0.30-0.60 |
0.020 |
0.010 |
≤0.50 |
8-9.50 |
0.3-0.60 |
0.15-0.25 |
T21 |
0.05-0.15 |
0.30-0.60 |
0.025 |
0.025 |
≤0.50 |
2.65-3.35 |
0.80-1.06 |
|
General Studded Tubes production capacity |
General specifications of Studded Tubes tubes |
Production facility: 3 finning machines; Daily capacity up to 80,000 studs; |
Tube OD: 219 mm max. Tube Thickness: 4mm~15mm Tube Length: 16 meters max. Studs OD: OD6mm~OD16mm Studs Height: 10mm Min. |
Manufacturing process:
Studs are fully automatically welded onto the tube by resistance welding.
Acceptance criteria
Approved drawings and the delivery conditions (TDC) of clients.
Delivery condition
Tube ends are square cut, free burrs, internally dried and air blown clean, externally coated with varnish at both ends of extruded bimetallic fin tube.
Surface Protection:
Oil dip, black coating or varnish.
Type of Studs
Cylindrical or elliptical
Documentation
It shall include raw materials mill certificates, inspection and test samples results and warranty certificate of manufacturer.
4.Applications:
Furnace
Chemical
Petrochemical industry
Power station etc.
5.Specifications:
Items |
General Materials |
Popular ASTM /ASME Materials |
Core Tube Material |
Carbon Steel Alloy Steel Heat Resistant Steel, Stainless Steel |
1. Carbon Steel: A106 Gr. B 2. Stainless Steel: TP304/304L,TP316/TP316L, TP347 3. Alloy Steel: P5,T5,P9,T9,T11,T22 |
Studs Material |
Carbon Steel Stainless Steel |
1. Carbon Steel 2. Stainless Steel: TP409/410,TP304/304L,TP316/TP316L, TP321/TP321L |
6.Dimensions Data Sheet We're Supplying.
General Descriptions of Studded tubes |
Popular Specifications we make |
Tube OD(mm) |
OD38mm~OD219mm |
Tube Wall Thickness(mm) |
4mm~15mm |
Tube Length(mm) |
16,000mm Max. |
Studs OD(mm) |
OD6mm~OD16mm |
Studs Height(mm) |
10mm~45mm |
Please email us for more information as your request. |
7.Competitive Advantage:
■ We have more than 10,000 square meters workshop, including 3 finning machines, daily extrusion capacity up to 80,000 studs.
■ Shanghai Port is our nearest seaport and airport, less than 2 hours’drive away from our workshop, convenient transportation.
■ Due to their high rigidity, studded tubes can be used even under extreme temperature and pressure conditions.
8.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |