Air Cooled Heat Exchanger Helical Aluminum L/LL/KL Type Fin Tube API Standard 661: Heat exchangers units for power plant(electric, nuclear, thermal and geothermal power plants); High corrosive systems (condensers, evaporators, sea water desalinations, fertilizing, urea systems, ammonia, gas, corrosive acids); The petroleum, chemical and petrochemical industries; The food processing and refrigeration industries; Natural gas treatment
Air Cooled Heat Exchanger Helical Aluminum L/LL/KL Type Fin Tube API Standard 661
1.Product Details:
Place of Origin: |
China, import materials are available |
Brand Name: |
Baerfu |
Certification: |
ISO... |
Model Number: |
Type L/LL/KL/G fin tubes |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Price: |
N/A |
Packaging Details: |
(1)Steel frame case sealed by plywoods with each end capped; (2)Solid fumigated wooden box with each end of capped. |
Delivery Time: |
Ex-work with 1 month on receipt of order. |
Payment Terms: |
T/T, L/C |
Supply Ability: |
Daily capacity up to 5,000 Meters |
3.Detailed Product Description
Compamy Type M: |
Manufacturer, Importer & Exporter |
Fin Type: |
Type G Fin Tube / Embedded Fin Tube |
Tube Material: |
Carbon Steel, Stainless Steel, Alloy Steel, Copper Etc... |
Fin Material: |
Aluminum, Copper And Steel |
Tube Length: |
No Limit |
|
|
High Light: |
finned tube,fintube |
■ API Standard 661 air cooled heat exchanger helical aluminum finned tubes
4.Quick Detail:
General L-type production capacity |
General specifications of L /LL /KL / G type fin tubes |
Finning Facility: 7 finning machines; Daily capacity up to 5000 meters; Fin type: Solid plain |
Tube OD: 50.8mm max. Tube Length: no limit Fin Height: 16 mm max. Fin Thickness: generally 0.4mm ~0.6mm Fin Pitch: 13FPI min. |
Surface Protection
Both bare ends shall be Zinc or Aluminum metalized applied by an electro spray arc system coating.
Acceptance Criteria
API Standard 661(Air-Cooled Heat Exchangers for General Refinery Service) or the delivery conditions (TDC).
Accessories
Tube Support Box, Clamp or Spacer Box (Material: Aluminum, Zinc and Stainless Steel).
5.Packing:
The desiccants are put into each package for continental transportation as well.
6.Applications:
The common application fields are:
■ Heat exchangers units for power plant(electric, nuclear, thermal and geothermal power plants);
■ High corrosive systems (condensers, evaporators, sea water desalinations, fertilizing, urea systems, ammonia, gas, corrosive acids);
■ The petroleum, chemical and petrochemical industries;
■ The food processing and refrigeration industries;
■ Natural gas treatment;
7.Specifications:
L Type Tension Wound Tube is combined with two different materials.
Items |
General Materials |
Popular ASTM Materials |
Core Tube Material |
Carbon steel, low-alloy steel, stainless steel, brass, copper, cooper-nickel alloys, aluminum bronze, nickel alloys. |
1. Carbon Steel: A179, A192,SA210 Gr A1/C,A106 Gr B 2. Stainless Steel: TP304/304L,TP316/TP316L 3. Copper:UNS12200/UNS14200/UNS70600, CuNi70/30,CuNi 90/10 4. Titanium: B338 Gr 2 |
Fins Material |
Aluminum & Copper & Steel |
1. Aluminum 2. Copper. 3. Steel |
All dimensions are in Inches and specification upon your requests. |
|||
Tube OD |
Fin Height |
Fin Thickness |
Fins per Pitch |
5/8 |
3/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
3/4 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 1/4 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 1/2 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
Pease email us for more information. |
8.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |