Heat Exchanger Type G Embedded Fin Tube Machine , Diameter 3/4" 1": Embedded Machine Mode No: Reliance-1518. Embedded Machine Power Output: 380V/50HZ (Chinese Standard). The motors of export embedded finning machine are supplied upon clients’ requests.
Heat Exchanger Type G Embedded Fin Tube Machine , Diameter 3/4" 1"
1.Product Details:
Place of Origin: |
China |
Brand Name: |
Baerfu |
Certification: |
ISO... |
Model Number: |
1518 |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Price: |
N/A |
Packaging Details: |
Solid fumigated wooden box loaded into 20 feet Container. |
Delivery Time: |
Ex-work within 2 months on receipt of deposits. |
Payment Terms: |
T/T, L/C |
Supply Ability: |
Ex-work within 2 months for one set machine. |
3.Detailed Product Description
Name: |
Embedded Fin Tubes Fining Machine |
Tube Material: |
Carbon Steel,Stainless Steel, Alloy Steel,copper Etc... |
Fin Material: |
Aluminum, Copper,Steel |
Fin Type: |
Embedded Fins/ G Fins |
Tube OD: |
15.88mm(Min.) |
Tube Length: |
No Limit |
Fin Height: |
16mm(Max.) |
Fin Pitch: |
2mm(Min) |
Fin Thickness: |
0.28mm~0.55mm |
Voltage: |
415V / 50HZ (as Per Client's Requirement) |
Package: |
Plywood Box (export Packing) |
Training: |
Supplier's Site OPERATION Training |
High Light: |
tube finning machine,finned tube machine |
G-Fin machine, tubes outer diameter 3/4" and 1", carbon and stainless steel, aluminium fins
4.Quick Details
heat exchanger Type G Fin tubes machine
Name |
Embedded Fin Tube Machine |
Brand/Mode No |
Reliance/ Mode No:1518 |
Tube Material |
Seamless steel tubes(CS,SS,AS) Welded steel tubes(CS,SS) Copper/Brass/Brone |
Fins Material |
Alu.1060 Alu 1100 Alu. 1050 Copper |
5.General description of G-Type finning machine.
1. Embedded Machine Mode No: Reliance-1518
2. Embedded Machine Power Output: 380V/50HZ (Chinese Standard).
3. The motors of export embedded finning machine are supplied upon clients’ requests.
6.One complete set of Embedded Finning Machine consisting following:
1. Finning head
2. PLC controlled power box
3. Without Finning input racks and output racks (We will offer design drawings before delivery)
5. Technical know-how(Operation Manual in English)
Dimensions Data are in Inches and specification upon your requests. |
|||
Tube OD |
Fin Height |
Fin Thickness |
Fins per Pitch(Density) |
5/8 |
3/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
3/4 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 1/4 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
1 1/2 |
5/8,1/2 |
.015/.016/ .020 |
6, 7, 8, 9, 10, 11, 12 |
Please email us for more information. |
7.Service After Sales
1. Technical support
2. Operation training at your site or in Reliance's Plant or both
3. Information on maximun production criteria
4. Reference charts
5. Specifications for tube and fin strips.
8.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |