SB338 G.2 Seamless Titanium Heat Exchanger Fin Tube , 30FPI Integral Low Finned Tubes: The fins are rolled out of outer wall of the plain tubes by a pass roller. Tubes and fins are in same piece tube. We call it“N”fin type.
SB338 G.2 Seamless Titanium Heat Exchanger Fin Tube , 30FPI Integral Low Finned Tubes
1.Product Details:
|
Place of Origin: |
China. |
|
Brand Name: |
Baerfu |
|
Certification: |
ISO... |
|
Model Number: |
Low Finned Tubes |
2.Payment & Shipping Terms:
|
Minimum Order Quantity: |
N/A |
|
Price: |
N/A |
|
Packaging Details: |
(1) All integral low fin tubes are packed in hexagonal bundles. (2) Steel frame case sealed by plywoods; 3: Solid fumigated seaworthy wooden box. |
|
Delivery Time: |
Ex-work with 1 month after order. |
|
Payment Terms: |
T/T, L/C |
|
Supply Ability: |
Daily capacity up to 5,000 Meters |
3.Detailed Product Description
|
Company Type: |
Manufacturer, Importer & Exporter |
Fin Tube Type: |
Low Fin Tubes |
|
Fins Type: |
Integral, N Type |
Tube Material: |
Carbon Steel,Stainless Steel, Brass,copper Etc... |
|
Acceptance Ceritia: |
WOLVERINE, HPT, GEWA-K & GEWA-KS |
Fin Thickness: |
~0.33mm |
|
Tube Length: |
No Limit |
Treatment: |
Heat Treatment If Needed |
|
Test: |
Hydro Test And Pneumatic Test |
Tube Wall Thk: |
No Limit |
|
High Light: |
Heat Exchanger Finned tube, heat exchanger tubular |
||
SB338 G.2 seamless titanium, 30FPI integral low finned tube
|
Titanium welded pipe / tubing |
ASTM B338, |
Gr1 GR2 GR7 GR12 |
OD (10.3~914) = (1/8~36)Inch |
|
Titanium seamless pipe / tubing |
ASTM B338, |
GR1 GR2 GR3 GR5 GR6 GR7 GR9 GR12 GR16 GR17 etc. |
OD (1.5~420) |
4.Quick Detail:
|
General Low Fin Tubes Production Capacity |
Specifications of Low Fin Tubes('N' Fins) |
|
|
Tube OD: 12.7 mm~25.4mm |
5.Description:
Manufacturing process: The fins are rolled out of outer wall of the plain tubes by a pass roller. Tubes and fins are in same piece tube. We call it“N”fin type.
6.Delivery of Low Fin Tubes
We can provide the integral low fin tubes with un-finned section gaps( 5mm Min.) in the middle of core tube OR bent with designed Bend Radius.
Quality Test:
The integral low fin tube quality is assured by hydrostatic or pneumatic tests, eddy current tests & MARCO tests in order to verify design specifications.
Acceptance ceritia:
WOLVERINE / HPT / GEWA-K & GEWA-KS
6.Delivery condition:
Tube ends are square cut, free burrs, internally dried and air blown clean, externally coated with varnish.The desiccants are put into the each package for continental transportation.
7.Applications:
The Integral Low Finned Tubes find the preference in the following industrial sectors:
Heating systems
Ventilation systems
Refrigeration and climate control systems
Mechanical engineering
Automotive manufacturing
Chemicals and pertrochemical and power plant technology
8.Specifications:


9.FAQ:
|
|
Q |
A |
|
01 |
How many days you need to install the equipment? |
30 days. |
|
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
|
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
|
04 |
Can the equipment be installed under hot weather? |
Yes. |
|
05 |
Can Your products be installed under the cold weather? |
Yes. |
|
06 |
Can I only buy some spare parts from you? |
Yes. |
|
07 |
Will you participate in the exhibition? |
Will do . |
|
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
|
09 |
What is your products standardization? |
National standard . |
|
10 |
How do you pack the equipment? |
Wooden box . |
|
11 |
Can you can design the equipment according to our size? |
Yes. |
|
12 |
How many years have your company made this kind of equipment? |
13 years . |
|
13 |
Which certificate do you have for your equipment? |
ISO |
|
14 |
Do you have any real project pictures of the equipment? |
Yes. |
|
15 |
How far is your factory from the airport? |
50 minutes . |
|
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
|
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
|
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
|
19 |
What is your MOQ? |
100 pcs . |
|
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
|
21 |
How long is your delivery time? |
40 days . |
|
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |
DIN 17175 P235GH TC1 DN40 48.3mm Heat Exchanger Fin Tube For Furnace
Welded 16Mn H Fin Heat Exchanger Tube For Steam Economizers
TP316 SMLS Stainless Steel Heat Exchanger Fin Tube Cylindrical Studs
U Bent Welded SA210 SMLS Fin Type Evaporator Tube With Surface Coating
12Cr1MoVG HH Fin Welded Heat Exchanger Tubes Rectangular Shaped
Extruded Bimetal A210 SMLS Refrigeration Low Fin Tubes For Boiler Superheater