SB338 G.2 Seamless Titanium Heat Exchanger Fin Tube , 30FPI Integral Low Finned Tubes: The fins are rolled out of outer wall of the plain tubes by a pass roller. Tubes and fins are in same piece tube. We call it“N”fin type.
SB338 G.2 Seamless Titanium Heat Exchanger Fin Tube , 30FPI Integral Low Finned Tubes
1.Product Details:
Place of Origin: |
China. |
Brand Name: |
Baerfu |
Certification: |
ISO... |
Model Number: |
Low Finned Tubes |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Price: |
N/A |
Packaging Details: |
(1) All integral low fin tubes are packed in hexagonal bundles. (2) Steel frame case sealed by plywoods; 3: Solid fumigated seaworthy wooden box. |
Delivery Time: |
Ex-work with 1 month after order. |
Payment Terms: |
T/T, L/C |
Supply Ability: |
Daily capacity up to 5,000 Meters |
3.Detailed Product Description
Company Type: |
Manufacturer, Importer & Exporter |
Fin Tube Type: |
Low Fin Tubes |
Fins Type: |
Integral, N Type |
Tube Material: |
Carbon Steel,Stainless Steel, Brass,copper Etc... |
Acceptance Ceritia: |
WOLVERINE, HPT, GEWA-K & GEWA-KS |
Fin Thickness: |
~0.33mm |
Tube Length: |
No Limit |
Treatment: |
Heat Treatment If Needed |
Test: |
Hydro Test And Pneumatic Test |
Tube Wall Thk: |
No Limit |
High Light: |
Heat Exchanger Finned tube, heat exchanger tubular |
SB338 G.2 seamless titanium, 30FPI integral low finned tube
Titanium welded pipe / tubing |
ASTM B338, |
Gr1 GR2 GR7 GR12 |
OD (10.3~914) = (1/8~36)Inch |
Titanium seamless pipe / tubing |
ASTM B338, |
GR1 GR2 GR3 GR5 GR6 GR7 GR9 GR12 GR16 GR17 etc. |
OD (1.5~420) |
4.Quick Detail:
General Low Fin Tubes Production Capacity |
Specifications of Low Fin Tubes('N' Fins) |
|
Tube OD: 12.7 mm~25.4mm |
5.Description:
Manufacturing process: The fins are rolled out of outer wall of the plain tubes by a pass roller. Tubes and fins are in same piece tube. We call it“N”fin type.
6.Delivery of Low Fin Tubes
We can provide the integral low fin tubes with un-finned section gaps( 5mm Min.) in the middle of core tube OR bent with designed Bend Radius.
Quality Test:
The integral low fin tube quality is assured by hydrostatic or pneumatic tests, eddy current tests & MARCO tests in order to verify design specifications.
Acceptance ceritia:
WOLVERINE / HPT / GEWA-K & GEWA-KS
6.Delivery condition:
Tube ends are square cut, free burrs, internally dried and air blown clean, externally coated with varnish.The desiccants are put into the each package for continental transportation.
7.Applications:
The Integral Low Finned Tubes find the preference in the following industrial sectors:
Heating systems
Ventilation systems
Refrigeration and climate control systems
Mechanical engineering
Automotive manufacturing
Chemicals and pertrochemical and power plant technology
8.Specifications:
9.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |