Seamless Cold Finished Mechanical Extruded Bimetallic Heat Exchanger Fin Tube: seamless cold finished mechanical extruded bimetallic finned tubes
Seamless Cold Finished Mechanical Extruded Bimetallic Heat Exchanger Fin Tube
1.Product Details:
Place of Origin: |
China.Imported materials are available. |
Brand Name: |
Baerfu |
Certification: |
ISO... |
Model Number: |
DR |
2.Payment & Shipping Terms:
Minimum Order Quantity: |
N/A |
Price: |
N/A |
Packaging Details: |
(1) Steel frame case sealed by plywoods (2) Solid fumigated wooden box. |
Delivery Time: |
Ex-work within 1 month after order. |
Payment Terms: |
T/T, L/C |
Supply Ability: |
Daily capacity up to 15,000 Meters. |
3.Detailed Product Description
Company Type: |
Manufacturer,Importer & Exporter |
Fin Tube Type: |
Extruded Fin Tube |
Fins Type: |
Solid Or Serrated |
Tube Material: |
Carbon Steel, Stainless Steel, Alloy Steel, Copper Etc... |
Fin Height: |
16 Mm Max |
Fin Material: |
Aluminum 1050, 1060,1070,1100,6063 |
Tube Length: |
No Limit |
Fining Process: |
Extrusion |
High Light: |
Heat Exchanger Finned tube,heat exchanger tubular |
■ seamless cold finished mechanical extruded bimetallic finned tubes
4.Detail:
ASTM A192 / A192M : Seamless Carbon Steel Boiler Tubes for High-Pressure Service
ASTM A210 / A210M : Seamless Medium-Carbon Steel Boiler and Superheater Tubes
ASTM A179 / A179M : Seamless Cold-Drawn Low-Carbon Steel Heat-Exchanger and Condenser Tubes
Tube Type:Seamless (Cold Drawn)
Ends:Plain ends or bevel ends.
Surface protection:black painting,anti-rust oil or varnish.
General extrusion production capacity |
General specifications of Extruded Fin Tubes |
Extrusion Facility: 14 finning machines. |
Tube OD: 12mm min.~50.8mm(2'') max. |
5.Specifications:
Extruded Bimetallic Finned Tube is combined with two different materials.
Items |
General Materials |
Popular ASTM Materials |
Core Tube Material |
Any metallic materials, as carbon steel, low-alloy steel, |
1. Carbon Steel: A179, A192,SA210 Gr A1/C,A106 Gr B |
Fins Material |
1. Aluminum Alloy |
1. Aluminum(Alu.1100,Alu.1060,Alu.6063) |
All dimensions are in Inches and specification upon your requests. |
|||
Tube OD |
Fin Height |
Fin Thickness |
Fins per Pitch(Density) |
5/8 |
3/8,1/2 |
.015/.016/ .020 |
4, 5, 6, 7, 8, 9, 10, 11, 12 |
3/4 |
3/8,1/2,5/8 |
.015/.016/ .020 |
4, 5, 6, 7, 8, 9, 10, 11, 12 |
1 |
3/8,1/2,5/8 |
.015/.016/ .020 |
4, 5, 6, 7, 8, 9, 10, 11 |
1 1/4 |
3/8,1/2,5/8 |
.015/.016/ .020 |
4, 5, 6, 7, 8, 9, 10, |
1 1/2 |
3/8,1/2,5/8 |
.015/.016/ .020 |
4, 5, 6, 7, 8, 9, 10, 11 |
1 3/4 |
3/8,1/2,5/8 |
.015/.016/ .020 |
4, 5, 6, 7, 8, 9, 10 |
2 |
3/8,1/2,5/8 |
.015/.016/ .020 |
4, 5, 6, 7, 8, 9, 10 |
Please email us for more information. |
6.Applications:
■ The common application fileds are:
■ Heat exchangers units for power plant(electric, nuclear, thermal and geothermal power plants);
■ High corrosive systems (condensers, evaporators, sea water desalinations, fertilizing, urea systems, ammonia, gas, corrosive acids);
■ The petroleum, chemical and petrochemical industries;
■ The food processing and refrigeration industries;
■ Natural gas treatment;
7.FAQ:
|
Q |
A |
01 |
How many days you need to install the equipment? |
30 days. |
02 |
How many staff abroad you sent to install the equipment? |
3 persons. |
03 |
Can I delivery the goods from other supplier to your factory? Then load together? |
Yes. |
04 |
Can the equipment be installed under hot weather? |
Yes. |
05 |
Can Your products be installed under the cold weather? |
Yes. |
06 |
Can I only buy some spare parts from you? |
Yes. |
07 |
Will you participate in the exhibition? |
Will do . |
08 |
How long it takes you to provide the designing options for us? |
1-2 working days . |
09 |
What is your products standardization? |
National standard . |
10 |
How do you pack the equipment? |
Wooden box . |
11 |
Can you can design the equipment according to our size? |
Yes. |
12 |
How many years have your company made this kind of equipment? |
13 years . |
13 |
Which certificate do you have for your equipment? |
ISO |
14 |
Do you have any real project pictures of the equipment? |
Yes. |
15 |
How far is your factory from the airport? |
50 minutes . |
16 |
How long it will take from guangzhou to your factory? |
2 hours by plane, 9-10 hours by high-speed rail. |
17 |
Do you provide sample? Free or charge? |
Samples can be provided, charges are required. |
18 |
What is your term of payment? |
30% prepaid, paid in full before shipment. |
19 |
What is your MOQ? |
100 pcs . |
20 |
Are you a trading company or a manufacturer? |
Manufacturer. |
21 |
How long is your delivery time? |
40 days . |
22 |
How many production lines in your factory? |
7 high-frequency resistance welding spiral fin tube production lines, 3 tube bending machines, 18 rolling extruders, 12 aluminum fin winding and inlaying machines. |